The orchestrator reached COMPLETE after 6 h 45 min with no operator action and no failed session, and the final reviewer accepted all 36 requirements on its first cycle. The render follows the storyboard and the site's design system and passes all 23 hidden acceptance cases. Artistically it is modest: it reads like an animated slide deck. Its opening photograph, a generated image from the supplied pack, is visibly AI-made.
-

The orchestrator reached COMPLETE after 3 h 55 min with no operator action and no failed session, and the final reviewer accepted all 27 requirements on its first cycle. The render passes 19 of 20 hidden acceptance cases: every caption in sync, both exclusions, the full call to action and a still final hold. It hides captions in the pauses between sentences. Visually it is clean but plainer than the Opus 5.5 render of the Spanish brief.
-

The orchestrator ended COMPLETE_WITH_GAPS after 8 h 36 min of run time. 18 tasks are done and the project's verify passes 25 checks, but the second and last final review asked for three more fixes that were not made: captions cover the call-to-action button and the result card's name, and a label overlaps the form footage. The render passes 15 of 20 hidden acceptance cases. It leaves out the generation wait and the dark call screens, which the Opus 5.5 render of the Spanish brief did not, but its captions vanish in pauses and two of its texts are hidden.
-

The orchestrator reached COMPLETE after 29 h 1 min in one segment, with no operator action. All 29 leaf tasks are done (16 planned at bootstrap, 6 split into smaller tasks, more added by replans and the final review), the project's verify passes 67 checks, and the final reviewer accepted all 23 requirements on its second cycle. The physics module passes all 16 hidden acceptance cases, including the frozen-block rate the Sushi attempt got wrong. The figure works in both themes, but its composition is cluttered.
-

The orchestrator reached COMPLETE after 17 h 20 min of run time in three segments. All 23 tasks are done (22 planned at bootstrap, one added by a replan), the project's verify passes 52 checks in 95 s (limit 240 s), and the final reviewer accepted all 27 requirements. The figure is a detailed microwave cutaway with power levels, contents, turntable and door controls. An independent check found that the frozen block warms 10 times faster than liquid water instead of 10 times slower; the model's own test asserts the inverted behaviour.
-

The orchestrator reached COMPLETE after 10 h 26 min of run time in three segments. All 14 model-planned tasks are done, the project's verify passes 35 checks in 103 s (limit 240 s), and the final reviewer accepted all 26 requirements. The model invented a paper-tape telegraph relay desk whose parts show prefix reuse, partial reuse, a miss, LRU eviction and refusal. 21 of 62 sessions ended on engine memory errors; none counted against a task.
-
Command-line app
add · import · report · budget · undo
Node.js, no dependencies
The orchestrator reached COMPLETE without intervention in 5 h 9 min. All 16 model-planned tasks are done, and the project's verify passes 50 checks. The final reviewer accepted coverage of all 20 requirements, and an independent end-to-end check of the brief's acceptance scenario passed apart from one wording issue.
-

The playable game was completed after manual continuation. The deterministic runner stopped during M03 after two unsuccessful sessions, and its planned independent final review did not run.
-

Built the ten-stage Obby 3D game. The final retained headless movement simulation completed the course in 36.4 seconds with zero deaths.
-

Completed the ten-stage Obby 3D game. Pi's final session summary reports a valid route, successful desktop/touch smoke checks and three full headless bot completions.
-

Produced a complete playable 3D arcade baseball game. Pi’s final session summary reports gameplay and restart checks; those checks were not independently rerun while archiving.
-

Codex completed a Digger 3D browser game build. The retained session notes report 28/28 simulation self-tests passing and a small interactive smoke check; manual acceptance remained partial.
-

Codex completed the one-shot task and produced a static Whiteout Protocol browser FPS build. No independent gameplay acceptance score is assigned.
-

Codex completed the one-shot task and produced a static one-inning 3D arcade baseball build. No independent gameplay test report was retained with the turn metrics.
-

Completed a three-inning 3D arcade baseball game with batting, pitching, fielding, scoring, and restart behavior. The visual presentation is acceptable, but gameplay does not consistently follow baseball rules.
-

Completed a deterministic Digger game with grid simulation and isometric Three.js presentation.
-
Inference suite
Latency · decode · cache
4K / 16K / 64K context
The 4K and 16K measurements completed; the 64K cold prefill was rejected by memory admission.
-
Inference suite
Latency · decode · cache
4K / 16K / 64K context
Completed the benchmark-only run across all three context rungs.
-

Completed a playable arcade Digger game and reported end-to-end verification.
-

Completed a separate Whiteout Protocol implementation and build with TensorFold.
-

Completed the Whiteout Protocol browser FPS challenge; the archived JavaScript and CSS match this run's build.
-

Completed the voxel garden challenge and produced a single-file HTML artifact.